Laserfiche WebLink
PARTB <br /> <br />AN ESTIIviATE OF THE COST OF THE I~ i~N,~NCE <br />2000-2001 <br /> WINDSOR LANDSCAPE/vlAINTENANCE DISTRICT <br /> NO. 1993-1, GREYSTONE HOMES <br /> CITY OF PLEASANTON <br /> <br />A. Landscaping (maintenance): 1. Tapesuy Way Area A (60,315 sq. i~.) <br /> 2. Creekside Area B (24,673 sq. i~.) <br /> 3. Enu'y Creekside Area C (16,307 sq. t~.) <br /> <br />total area 101,295 sq. ~ ......................2 ..............................$ 9,640.00 <br /> <br />B. Water <br /> <br />1. All Planting ...................................................................$ 6,532.00 <br /> <br />C. Power <br /> <br />1. 2 Controllers ($15 per month) ........................................$ 360.00 <br /> <br />D. Reserve/Repair <br /> 1. All Planting areas, entry and highway walls and enU'y <br /> signage ..........................................................................$ 4,727.90 <br /> <br />E. Ci~ of Pleasanton Administration Fee .................................................$ 2.600.00 <br /> SUBTOTAL $23,859.90 <br /> <br />County Fees for Collection ofAssessments (l.7%) ......................$ 405.90 <br /> <br />GRAND TOTAL .........................................................................$24,265.80 <br /> <br />Assessment per Unit (90 units) ...............................$269.62 per year <br /> <br />An existing surplus of approximately $14,000 exists for Landscape DiSLrict 1993-1. These funds are held in the <br />interest bearing account until needed for repairs or future replacement of the soundwalls, landscaping or other <br />district features. <br /> <br />4 <br /> <br /> <br />