My WebLink
|
Help
|
About
|
Sign Out
RES 94083
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1994
>
RES 94083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 4:27:10 PM
Creation date
6/15/2000 10:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/19/1994
DOCUMENT NO
RES 94083
NOTES
CIP
NOTES 3
BUDGET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />1994/95 - 1998/99 <br />Unfunded Projects <br />Other Unfunded Projects <br />STREETS <br />Pg. # No developer funding: <br />165 West Las Positas Lan of 1-680 Road Improvements 240,000 <br />165 Traffic Signal: Valley Avenue & Gate 12/Koll Crater Parkway 132,000 <br />166 Traffic Signal/Cbn®el zati a on Santa Rita Rd at Amadur IL S. 367,000 <br />166 Traffic Signal: Foothill High School Driveway 152,000 <br />167 Third Street Reconstruction (Abbie to Neal) 403,400 <br />167 Street Landscape Improvements: Stmtaidge Mall Road 15,000 <br />168 Stoneridge Drive Extensice (Rheem Drive to Kamp Drive) 325,400 <br />168 Soundwall Installation: Varian Locations 99,000 <br />169 Realignment of Ray Street and St. John B Main Street 3,000,000 <br />169 Johnson Drive Sidewalk: Stonaidge Dr- Hilton Hotel 100,000 <br />170 Foothill Road Widening 1,000,000 <br />170 Eneasicm of Railroad Street (Spring Street to Ray St) 2,170,000 <br />171 Del Valle Parkway Extension (Stanley to California Ave) 549,000 <br />171 Central Traffic Computer 108,000 <br />172 Del Ville Parkway Extension Right-of-Way 755,800 <br />172 Street Landscape - NE side of Hopyard 150,000 <br />173 Junipero Street Frontage Improves 8,900 <br />173 Median Island/Parkway Strip Landscape Renovation 40,000 <br />174 Median Island Landscape Renovation (3 sites) 188,300 <br />174 Landscape Planters Various Locations (Amber Wy) 37,000 <br />175 Bernal Ave Underpass Landscape Renovation 26,900 <br />175 Vineyard Avenue Median Island Landscaping 129,000 <br />Partial developer funding: <br />176 Undergrotmd of Overhead Utilities on "Old" Stanley Blvd 30,600 <br />176 Traffic Signal: Valley Avenue at Hansen Drive 122,000 <br />177 Mohr Ave. Utility Undergrotmding: Santa Rita Rd- Oakland Ave 198,000 <br />177 Foothill Rd Widening at Dub. Canyon/Canyon Way (Dev) 720,000 <br />178 Sycamore Road Reconstr:Sunol Blvd -900' East of Sunol Blvd 346,200 <br />178 Kottinger Drive Reconstruction 314,600 <br />179 Busch Road Improvements at Operations Service Center 285,000 <br />179 Dublin Canyon Road Widening 1,669,600 <br />Full Developer Funding <br />180 Stoneridge Mall Road Sidewalks 100,000 <br />180 Stoneridge Drive at Stoneridge Mau Road Widening 111,000 <br />181 01d Bernal Avenue at Bernal Avenue Improvements 60,000 <br />181 Fan Street Utility Undergramding 37,000 <br />182 Division Street Utility Undergrounding 70,000 <br />xxiv <br />ACOMP.WK4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.