My WebLink
|
Help
|
About
|
Sign Out
RES 94083
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1994
>
RES 94083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 4:27:10 PM
Creation date
6/15/2000 10:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/19/1994
DOCUMENT NO
RES 94083
NOTES
CIP
NOTES 3
BUDGET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISCFLT.ANF.f)US <br />• Provide $150,000 for the procurement of a permit issuance system to meet future <br />demands for land based information and to move closer toward the City's goal of a <br />centralized land information system. <br />• Provide $100,000 for costs related to the Valley Animal Shelter which is currently under <br />construction in cooperation with Alameda County. <br />• While an exact expenditure total has not been identified, staff intends to move forward with <br />exploring options for an Emergency Facility located in Ruby Hills capable of providing <br />emergency medical services to residents in the areas. Fire services to the area will be provided <br />in conjunction with the City of Livermore through a proposed cooperative agreement. <br />• Provide $590,000 to begin design and construction of a new fire station number #4. Staff is <br />currently evaluating potential sites and intends to make a recommendation within the next four <br />to six months. <br />• Provide $275,000 to replace a 1969 fire engine which has experienced considerable repairs and <br />minor malfunctions over the past few years. <br />• Provide $552,000 for the renovation of Valley Trails park. <br />WATER <br />• Provide $525,000 to replace worn water mains. <br />• Construct the $448,800 Del Valle Parkway Water Main Extension project. <br />• Provide $200,000 for Foothill Boulevard Water System Improvements. <br />SEWER <br />• Construct the East Amador Trunk Sewer Rehabilitation project for an estimated project cost of <br />$1,657,312. <br />• Purchase a sewer telemetry system to monitor critical sewer locations for an estimated $82,000. <br />xu <br />
The URL can be used to link to this page
Your browser does not support the video tag.