Laserfiche WebLink
Sec. <br /> <br />Sec . <br /> <br />7.9 <br /> <br />7.10 <br /> <br />.(3) A list of persons, organizations and public <br /> agencies commenting on the Draft EIR. <br /> <br />(4) <br /> <br />The responses of the Lead Agency to significant <br />environmental points raised in the review and <br />consultation process. <br /> <br />Degree of Specificity. <br /> <br />(c) Delete entire subsection. <br /> <br />EIR as Part of General Plan. <br /> <br />The requirements for an EIR on a local general plan, <br />element or amendment thereof will be satisfied by the <br />general plan or element document, and no separate EIR <br />will be required, if: (1) the general plan addresses <br />all the points required to be in an EZR by Article 7 <br />of these Guidelines and (2) the document contains a <br />special section or a cover sheet identifying where the <br />general plan document addresses each of the points <br />required. <br /> <br />-10 - <br /> <br /> <br />