Laserfiche WebLink
Total fee for Lot = [~ Lot Water EDUs x estimated Water costs] <br /> 353 EDUs ] <br /> + [#Lot Sewer EDUs x estimated Sewer costsl <br /> 233 EDUs <br /> + [~ Lot roadway EDUs x estimated Roadway costs] <br /> 608.5 EDUs <br /> + [//Lot Detention Basin EDUs x estimated Detention Basin costs] <br /> 241.9 EDUs ] <br /> + [# Lot Utility EDUs x estimated Utility costs] <br /> 261.7 EDUs ] <br /> + [# Specific Plan Prep. EDUs x estimated Specific Plan PreO. costs] <br /> 239.7 EDUs ] <br /> <br />The number of EDUs assigned to each Lot for each infrastructure component is shown in <br />Table 2. <br /> <br />Initial costs for each shared infrastructure improvement shall be those costs estimated in <br />Table 1 as follows: <br /> <br />(a) <br />(b) <br />(c) <br />(d) <br />(e) <br /> <br />Initial Water Costs = Estimated Costs of Parts 1 +2+3+4+5 = $2.870.340 <br />Initial Sewer Costs = Estimated Costs of Parts 1 +2+3+4+5 = $1.510.000 <br />Initial Roadway Costs = Estimated Costs of Parts 1+2+3+4+5 -~ $3.835.579 <br />Initial Detention Basins Costs = Estimated Costs of Parts 3+4 = $672.000 <br />Initial Utility Costs = Estimated Costs of Part 5 = $1.260.000 <br />Initial Specific Plan Preparation Costs = Estimated Costs of Part 5 = $250.000 <br /> <br />Initial Roadway Costs shall be adjusted to reflect the total roadway cost after adjustments for <br />Ruby Hill's total cost share and previously installed roadway improvements (see Specific <br />Plan). <br /> <br />Example 10 A. The initial costs as described above result in theJbllowing.[~,es: <br /> New Residential Unit = $ 29, 551 <br /> <br />Existing Home <br /> Water Connection = $ 8. ] 31 <br />Sewer Connection = $ 6, 481 <br />As Part of Subdivision = $ ] 9. 427 <br />Park = $1,149, 444 <br />Elementary School = $3.168. 359 <br /> <br />Example lOB. Using a hypothetical example ef only initialJ~es above (which <br />cannot occur because improvements would be required for any prqfect), the <br />developer qf Lot 9 would owe Specific Plan fees equal to 4 new lots x $29,55] per <br />new residential unit, or $118,204 upon initial subdivision. <br /> <br />Example lOG As above, developer of Lot 4 would owe fees equal to 6 new lots x <br />$29.551 per new residential unit plus I existing lot x $19.427 per existing home <br />as part of a subdivision, for a total of $196, 733 upon initial subdivision. <br /> <br />7 <br /> <br /> <br />