My WebLink
|
Help
|
About
|
Sign Out
RES 77109
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1970-1979
>
1977
>
RES 77109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2001 7:55:33 PM
Creation date
3/22/2000 5:00:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/11/1977
DOCUMENT NO
RES 77109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Paymont for amounts due aboTe :~ball be paid <br /> monthly. <br /> (4) Payment for the amount due under the fixed fee <br /> above shall be in twelve equal monthly instal- <br /> lments beginning the first month after authoriza- <br /> tion to proceed with the work, <br />C. Article IV - Schedule of Work is amended to read as follows: <br /> <br /> The work will be done under the supervision of and as directed by the <br /> <br />Director of Public Works of the CITY or his duly appointed representative. <br />· A schedule for carrying out this assignment will be as proposed in a pre- <br />pared work schedule and the Director of Public Works will be kept informed <br />as to the progress of work by informal reports on a monthly basis or sooner <br />if so requested by the Director of Public Works. The work required to be <br />performed per the time schedule shall not commence until after receipt by <br />Engineer of written notice to proceed from CITY. <br /> <br /> Survey, soils, corrosion study and the coordination and direction of <br /> same will be substantially completed within the time schedule submitted by <br /> Engineer to City. <br /> <br /> The design work shall be scheduled a~d performed on a generally con- <br /> tinuous basis and shall be fully completed within nine months after authori- <br /> zation has been received to prepare detailed plans and specifications. Pre- <br /> liminary drafts of Operation and Maintenance Manual shall also be completed <br /> during the design period. <br /> <br /> All time schedules are subject to timely reviews by the S~CB and other <br /> reviewing agencies and provided that no unexpected major revisions are re- <br /> quired after such reviews~ Said time schedules are also subject to the <br /> occurrence of unforeseen events outside of the control of Engineer, or approv~d <br /> subcontractor. Engineer shall promptly notify City of any delays to the time <br /> <br />-7- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.