Laserfiche WebLink
· ur each ra~ed HP or fraction thereof <br />by which the ratir' exceeds 10 HP <br />(maximum any one u~,~t, $20.00) <br /> <br />Generators, including switchboard and <br />controlling apparatus: <br /> <br />For each rated K.W. or K.V.A. or fraction <br />threof (maximum, any one unit, $20,00) <br /> <br />(12) Transformers and balancc coils: <br /> <br />(~qhen not part of other apparatus for which <br />fee is otherwise specified) <br /> <br />For each rated K.W. or K.V.A. or fraction <br />(maximum, any one bank, $50.00) <br /> <br />(13) Signs: <br /> <br />(a) Self contained with U.L. label: <br /> <br />i. Install or relocate, each <br />ii. Alter electrically <br /> <br />(b) Self contained, without U.L. ]_abel: <br /> <br />i. Pre-installation inspection, <br /> each <br />ii. Install or relocate, each <br />iii. Alter electrically, each <br /> <br />(c) External illumination for display <br /> or outline: <br /> <br />i. Gas tube, per transformer <br />ii. Incandescent, per lamp <br />iii. Fluorescent, per tube <br /> <br />(14) Services, new or change, including one <br /> meter base: <br /> <br />(a) Over 600 volts: <br /> <br />i. First 200 KVA <br />ii. Over 200 KVA <br />iii. Meter bases, over one, each <br /> <br />(b) 600 volts or less: <br /> <br />i. First 200 amps <br />ii. Additional 100 amps or fraction <br />iii. Meter bases, over one, each <br /> (maximum for any one service, <br /> $25.00) <br /> <br />(C) Temporary power pole and connected <br /> temporary wiring: <br /> <br />i. For construction purposes <br /> ii. For Christmas tree lots and <br /> similar temporary uses <br /> <br />-5- <br /> <br />.40 <br /> <br />.25 <br /> <br />.20 <br /> <br />1.50 <br />2 .00 <br /> <br />10,00 <br /> 1.50 <br /> 5.00 <br /> <br />.50 <br />.10 <br />.25 <br /> <br />10.00 <br />25.00 <br /> .50 <br /> <br />2.00 <br /> .50 <br /> <br />.50 <br /> <br />2.00 <br /> <br />5.00 <br /> <br /> <br />