Laserfiche WebLink
ENGINEER'S FINAL SCHEDULE OF COSTS <br />FOR CITY - COUNTY AGREEMENT <br />ASSESSMENT DISTRICT NO. 1974-1, STONERIDGE CENTER <br /> FINAL CONSTRUCTION COST <br /> <br />Construction Costs <br /> <br />O.C. Jones Contract <br /> <br />Irrigation Meter <br /> <br />Warning Beacons & Lights <br /> <br />SMI, Signal Checking <br /> <br />SMI, Signal Turnon <br /> <br />P.G. & E. Street Lighting <br /> <br />Caltrans Striping <br /> <br />Steiny, Electrolier Lamps <br /> <br />TOTAL CONSTRUCTION <br /> <br />Preliminary & Construction Engineering <br /> <br />Civil Engr. 10.5% x $1,041,675.03 $ <br />Landscape Architect <br />Soils Engineer <br />Traffic Engineer <br />City Inspection 4% x $1,041,675.03 <br /> <br />TOTAL ENGINEERING <br /> <br />C. Right-of-Way <br /> <br /> TOTAL COST <br /> <br />FUNDING <br /> <br />Developer's Share <br />City's Share <br />County's Share <br /> <br /> TOTAL <br /> <br />$ 1,012,478.59 <br />5,450.00 <br />11,869.00 <br />1,350.00 <br />909.69 <br />6,946.00 <br />2,041.75 <br />630.00 <br /> <br /> $1,041,675.03 <br /> <br />109,375.88 <br />5,432.99 <br />10,902.95 <br />4,790.72 <br />41,667.00 <br /> <br />172,169.54 <br /> <br />120,903.00 <br /> <br />$1,334,747.57 <br /> <br />$ 889,831.57 <br /> 222,458.00 <br /> 222,458.00 <br /> <br />$1,334,747.57 <br /> <br />'1- <br /> <br /> EXHIBIT <br /> <br /> <br />